Goldplat plc, the AIM listed African gold producer, is pleased to announce the completion of a JORC-compliant Resource Statement for the Tailings Storage Facility (‘TSF’) at the Goldplat Recovery (Pty) Limited operations in South Africa (‘GPL’).
GPL has been depositing tailings onto this TSF since January 2003 with the intention to eventually reprocess the material as it is known to contain significant quantities of gold and other minerals. In order to be able to accurately assess the economic viability of reprocessing the TSF it is necessary to know the mineral content and distribution of value within the TSF, and the metallurgy in order to design an appropriate processing facility and production plan.
To read the full press release please click here